公告: 

C-Kore Monitors Umbilical Setup on Shell’s Nelson Field

   2019-01-09 world newssubsea61
核心提示: C-Kore Systems has recently deployed its Cable Monitor subsea testing units in the North Sea to monitor the instal
 C-Kore Systems has recently deployed its Cable Monitor subsea testing units in the North Sea to monitor the installation of a new umbilical in Shell’s Nelson field.
According to the company, the health of the umbilical was constantly monitored and data-logged during the entire installation process from load-out to lay.
 
This gave constant assurance that the cable remained in good health throughout the campaign and was installed successfully on the seabed without damage, C-Kore explained.
 
C-Kore’s Cable Monitor Units are used on fault-finding and installation operations to test electrical line health, including insulation resistance and continuity measurement.
 
Greg Smith, general manager for C-Kore Systems, said: “We are pleased to continue to work closely with Shell on many campaigns, including this new installation project. The CKore units have again proved their value, saving Shell money by automating the entire measurement process and eliminating time consuming old-fashioned testing methods.”
 
举报收藏 0打赏 0
 
更多>同类报道
推荐图文
推荐报道
点击排行
网站首页 | 关于我们 | 隐私政策 | 使用协议 | 会员服务 | 用户反馈 | 联系我们 | 交流社区 | 营业执照
客服/合作/投诉:+86-23-81216771 邮箱:oilmc@vip.qq.com 备案:渝ICP备2024042459号-1
© 2006-2023  All Rights Reserved. 本站所有信息均为会员发布,虽已初步审核仍请自行注意识别验证其有效。